Primex News International

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Cordelia Cruises Crushes the Monsoon: Rs 585 Million Profit Blasts Past Last Year’s Loss

    October 9, 2026

    Love Marriage and Relationship Problems: Guidance from Astrologer Sonu Sharma

    October 9, 2026

    British Indian MP Shivani Raja, in India on Parliamentary Visit, Congratulates Prime Minister Narendra Modi on 25 Years as Head of Government

    October 9, 2026
    Facebook Twitter Instagram
    Primex News International
    • Home
    Facebook Twitter Instagram
    Primex News International
    Home»Business»KP Energy receives NoA from NTPC REL for 464.10 MW BoS package for wind energy project in Gujarat
    Business

    KP Energy receives NoA from NTPC REL for 464.10 MW BoS package for wind energy project in Gujarat

    By October 2, 2023No Comments2 Mins Read
    Facebook Twitter Pinterest Telegram LinkedIn Tumblr WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Telegram Email

    Surat (Gujarat) [India], October 2: KP Energy Limited, a leading player in the renewable energy sector, has achieved a significant milestone by receiving a Notification of Award (NOA) from NTPC Renewable Energy Limited (NTPC REL) for a 464.10 MW Balance of System Package. This package is part of an Inter-State Transmission System (ISTS) Connected Wind Energy project in Gujarat.

    KP Energy clinched the contract from NTPC REL, a subsidiary of NTPC, through a rigorous and highly competitive bidding process, reaffirming its excellence in the renewable energy domain. The project falls under the company’s Captive Power Producer (CPP) business segment.

    Under the contracts, KP Energy will provide a comprehensive suite of services, including Engineering, Procurement, Construction, and Commissioning (EPCC). These services encompass the acquisition and transfer of land for the project, the supply of all necessary equipment for the balance of plant, and the provision of various services related to unloading, storage, on-site handling, installation, insurance, civil and allied works, integration into the grid, testing, and commissioning. Additionally, the company will be responsible for the operation and maintenance of the contract scope for three years, ensuring its optimal performance and reliability.

    Dr. Faruk G Patel, Chairman and Managing Director of KP Group, said, “We are thrilled to receive the Notification of Award for this vital project from NTPC REL. It underscores our strong presence in the renewable energy sector and our expertise in the timely execution of challenging projects. The project aligns with our mission to contribute to sustainable energy solutions and reflects the trust clients have in our project execution capabilities. KP Group remains committed to delivering high-quality renewable energy projects that contribute to India’s green energy goals and promote a cleaner and greener future.”

    As per the contract, the project is slated to be completed within 21 months from the date of the NOA.

    Earlier, KP Energy successfully commissioned a 29.4MW (Phase-II) ISTS-connected wind power project comprising 14 WTGs of 2.1 MW each at Sidhpur site in Devbhumi Dwarka.

    Business
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Cordelia Cruises Crushes the Monsoon: Rs 585 Million Profit Blasts Past Last Year’s Loss

    October 9, 2026

    Rathi Steel And Power Limited Q2 FY27 Revenue at Over Rs 200 Cr, Growth of Over 30% YoY; Sales Volume Growth at ~28.86% YoY

    October 9, 2026

    PH1 Industries, Specialised Engineering Solutions Provider, Files DRHP with NSE Emerge

    October 9, 2026

    Investment Management and Financial Services Company Swyom Advisors Limited Files DRHP with BSE SME

    October 9, 2026

    Fabience Unveils State-of-the-Art Furniture Mega-Plant in Hyderabad

    October 9, 2026

    M-SANVI Real Estate Broadens Residential Offering as Delhi-NCR Buyers Seek More Space and Flexibility

    October 9, 2026

    Comments are closed.

    Top Reviews
    Editors Picks

    Cordelia Cruises Crushes the Monsoon: Rs 585 Million Profit Blasts Past Last Year’s Loss

    October 9, 2026

    Love Marriage and Relationship Problems: Guidance from Astrologer Sonu Sharma

    October 9, 2026

    British Indian MP Shivani Raja, in India on Parliamentary Visit, Congratulates Prime Minister Narendra Modi on 25 Years as Head of Government

    October 9, 2026

    Central India’s Biggest Industrial Expo: ‘Plast Pack 2026’ to Showcase the Technology of the Future

    October 9, 2026
    About Us
    About Us
    Our Picks

    Cordelia Cruises Crushes the Monsoon: Rs 585 Million Profit Blasts Past Last Year’s Loss

    October 9, 2026

    Love Marriage and Relationship Problems: Guidance from Astrologer Sonu Sharma

    October 9, 2026

    British Indian MP Shivani Raja, in India on Parliamentary Visit, Congratulates Prime Minister Narendra Modi on 25 Years as Head of Government

    October 9, 2026
    Top Reviews
    © 2026 Primex News International. Designed by Primex Media Services.
    • Home

    Type above and press Enter to search. Press Esc to cancel.