Primex News International

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Digital Twin: The Doorway to Smart Manufacturing

    June 27, 2025

    Meet SURAJ SINGH MAS: The Producer Creating Purpose-Driven Stories in Indian Cinema

    June 27, 2025

    From Snacks to Celebrations: The Camy & Celejor Story

    June 27, 2025
    Facebook Twitter Instagram
    Primex News International
    • Home
    Facebook Twitter Instagram
    Primex News International
    Home»Business»KP Energy receives NoA from NTPC REL for 464.10 MW BoS package for wind energy project in Gujarat
    Business

    KP Energy receives NoA from NTPC REL for 464.10 MW BoS package for wind energy project in Gujarat

    By October 2, 2023No Comments2 Mins Read
    Facebook Twitter Pinterest Telegram LinkedIn Tumblr WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Telegram Email

    Surat (Gujarat) [India], October 2: KP Energy Limited, a leading player in the renewable energy sector, has achieved a significant milestone by receiving a Notification of Award (NOA) from NTPC Renewable Energy Limited (NTPC REL) for a 464.10 MW Balance of System Package. This package is part of an Inter-State Transmission System (ISTS) Connected Wind Energy project in Gujarat.

    KP Energy clinched the contract from NTPC REL, a subsidiary of NTPC, through a rigorous and highly competitive bidding process, reaffirming its excellence in the renewable energy domain. The project falls under the company’s Captive Power Producer (CPP) business segment.

    Under the contracts, KP Energy will provide a comprehensive suite of services, including Engineering, Procurement, Construction, and Commissioning (EPCC). These services encompass the acquisition and transfer of land for the project, the supply of all necessary equipment for the balance of plant, and the provision of various services related to unloading, storage, on-site handling, installation, insurance, civil and allied works, integration into the grid, testing, and commissioning. Additionally, the company will be responsible for the operation and maintenance of the contract scope for three years, ensuring its optimal performance and reliability.

    Dr. Faruk G Patel, Chairman and Managing Director of KP Group, said, “We are thrilled to receive the Notification of Award for this vital project from NTPC REL. It underscores our strong presence in the renewable energy sector and our expertise in the timely execution of challenging projects. The project aligns with our mission to contribute to sustainable energy solutions and reflects the trust clients have in our project execution capabilities. KP Group remains committed to delivering high-quality renewable energy projects that contribute to India’s green energy goals and promote a cleaner and greener future.”

    As per the contract, the project is slated to be completed within 21 months from the date of the NOA.

    Earlier, KP Energy successfully commissioned a 29.4MW (Phase-II) ISTS-connected wind power project comprising 14 WTGs of 2.1 MW each at Sidhpur site in Devbhumi Dwarka.

    Business
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Digital Twin: The Doorway to Smart Manufacturing

    June 27, 2025

    Meet SURAJ SINGH MAS: The Producer Creating Purpose-Driven Stories in Indian Cinema

    June 27, 2025

    From Snacks to Celebrations: The Camy & Celejor Story

    June 27, 2025

    Unlocking Opportunities: Your Guide to Business Setup in Dubai

    June 27, 2025

    Founders Under 40 Who Are Building the Next Big Thing

    June 27, 2025

    Inauguration of Electric Vehicles in TATA Steel

    June 27, 2025

    Comments are closed.

    Top Reviews
    Editors Picks

    Digital Twin: The Doorway to Smart Manufacturing

    June 27, 2025

    Meet SURAJ SINGH MAS: The Producer Creating Purpose-Driven Stories in Indian Cinema

    June 27, 2025

    From Snacks to Celebrations: The Camy & Celejor Story

    June 27, 2025

    Excellent NEET Academy Records Highest Medical Seat Selections in Dharwad for NEET 2025

    June 27, 2025
    About Us
    About Us
    Our Picks

    Digital Twin: The Doorway to Smart Manufacturing

    June 27, 2025

    Meet SURAJ SINGH MAS: The Producer Creating Purpose-Driven Stories in Indian Cinema

    June 27, 2025

    From Snacks to Celebrations: The Camy & Celejor Story

    June 27, 2025
    Top Reviews
    © 2025 Primex News International. Designed by Primex Media Services.
    • Home

    Type above and press Enter to search. Press Esc to cancel.